Colorado State University

Chemistry Building

Location: Fort Collins, CO
Completed: 2017
Project Type: Laboratory
Products: Venturi Valves, Water Coils, Laboratory Room Controls, Fume Hood Controls
Project Size: 60,000 ft²
Construction Cost: $41 Million
Engineer: Cator Ruma & Associates

University of Colorado

Anschutz Medical Campus Bioscience 2 Building

Location: Aurora, CO
Completed: 2015
Project Type: Laboratory
Products: Venturi Valves, Water Coils, Laboratory Room Controls, Fume Hood Controls
Project Size: 112,000 ft²
Construction Cost: $38 Million
Engineer: M-E Engineers, Inc.

University of Denver

Felix Ritchie School of Engineering and Computer Science

Location: Denver, CO
Completed: 2016
Project Type: Laboratory
Products: Venturi Valves, Water Coils, Laboratory Room Controls, Fume Hood Controls
Project Size: 130,000 ft²
Construction Cost: $65 Million
Engineer: Shaffer • Baucom Engineering & Consulting

T3 RiNo

3500 BLAKE STREET – DENVER, CO

Location: Denver, CO
Completed: 2024
Project Type: Office
Products: Air Handling Units, Energy Recovery Units, Fans, Louvers, Grilles, Registers, Diffusers
Project Size: 220,000 square ft
Construction Cost: >$91,000
Engineer: Alvine Engineering

 

Read the case study

Grand Junction High School

 

Location: Grand Junction, CO
Completed: 2024
Project Type: High School
Products: Sound Attenuators
Project Size: 265,000 sq ft., 3 stories
Construction Cost: >$144 Million

 

Read the case study